Wednesday, October 16, 2013

Siding Almost Done

Finishing up on the siding, next up is the brickwork underneath...




And the septic grass took pretty well...




Tuesday, October 15, 2013

Back Entry Doors

The 4 panel door to the back screened in deck...



And the 2 panel door in the basement walkout...



Saturday, October 12, 2013

Snakes and Electric Rough-in

While moving lumber, this copperhead came slithering out...


Electrical, HVAC and plumbing rough-ins done.  Here is the electrical panel in the garage...


The fireplace TV inset is done...


And more siding going up...





Saturday, October 5, 2013

More Siding, Fireplace, and Grass oh my!

Siding continues...


The fireplace is installed...


And more grass growing in the Septic field...




Monday, September 30, 2013

Siding starts

The lines where snapped to indicate siding locations...



And here it goes, starting at the back of the house...