I'm getting the bathroom prepared for tiling. I've got the tub installed, including the plumbing. And I've cut and arranged the tile, labeling in them in the order I will use adhesive to lay them down.
I also started to put in all the insulation which is quite a lot. I actually furred out the 2x4 walls to make the 2x6, and am installing R-21 to add some better insulation.
No comments:
Post a Comment