I also started to put in all the insulation which is quite a lot. I actually furred out the 2x4 walls to make the 2x6, and am installing R-21 to add some better insulation.
I'm a licensed North Carolina General Contractor who built a home to sell in 2008, and then built my own family home in 2014. I'm also a software engineer, marathon runner, and an occasional terrible golfer. I document my DIY experiences through this blog. ( http://wanderski.com )
Friday, December 28, 2018
Attic Bathroom and Insulation
I'm getting the bathroom prepared for tiling. I've got the tub installed, including the plumbing. And I've cut and arranged the tile, labeling in them in the order I will use adhesive to lay them down.
Attic Rough-In
After a long summer where it was way too hot to work in the attic, I'm finally back to the project hoping to complete it in a couple months. I have most of the rough-in electrical, plumbing and HVAC complete. I am making sure everything works and is ready to go even before drywalling just in case ;-) Also install all the necessary baffles needed to keep the air flowing through the soffits to the ridge vents.
Subscribe to:
Posts (Atom)