Tuesday, May 8, 2018

Golf Range

Started by just laying out how I wanted the box to be and trying to get an idea of how it will all look.


Then used some blocks and made sure everything was leveled to the way I wanted it.  Finally I drilled 3/4" holes through the timber and drove in 2 foot stakes to keep everything in place.


Since the location is on a slope, filled one side with extra gravel I already had.


Then filled in the box with soil as well as sloped the sides outside the box.


Then topped it off with a small layer of mulch.


Lastly, stood up the driving range net and tied it down with small rope and screws into the timber.  Four!!


No comments:

Post a Comment