Friday, December 6, 2013

Final Details Before Drywall

Spent a good portion of the day stripping all the structured wiring to make it easier to pull through once the drywall is up.



Also added foam insulation in a small cavity in the pocket door frame where traditional batts wouldn't work.


And luckily caught a mistake where the pocket door frame was installed too low and had to redo the track height, and because it's a 2x6 wall, also had to pack out the nailing header.



No comments:

Post a Comment