Well was drilled to 425 feet and was able to achieve 13.5 gallons/minute at which point we called it.  I was hoping to get 15 g/m, but anything 10+ should be plenty and the cost didn't seem to justify drilling deeper anymore.


Septic installer showed up and started, I'm hopeful that he will complete the installation including drain field, D-box and tank by EOD tomorrow (because foundation trucks are scheduled to show up the following morning ;-).



A couple other things happened as well, the temporary electric pole was installed and inspection called in for, and probably most importantly, the construction loan was finally signed and closed so that I can pay people ;-)