The lines where snapped to indicate siding locations...
And here it goes, starting at the back of the house...
I'm a licensed North Carolina General Contractor who built a home to sell in 2008, and then built my own family home in 2014. I'm also a software engineer, marathon runner, and an occasional terrible golfer. I document my DIY experiences through this blog. ( http://wanderski.com )
Monday, September 30, 2013
Saturday, September 28, 2013
Friday, September 27, 2013
Wednesday, September 25, 2013
Tuesday, September 24, 2013
Monday, September 23, 2013
Windows, Roof flashing and new Insulation requirements
Windows delivered today (finally)...
Roofer installed all pre-flashing so that siding can be installed without issue...
And now you need to use Thermo-ply (a.k.a. T-ply) to face and fasten insulation to exterior walls where tubs and showers go...
Friday, September 20, 2013
Seeding the Septic take 2
Flatten the septic area a little more with a small bobcat, although it's still not perfect. It's going to be good enough, and thus seeding with fescue for the fall...
Thursday, September 19, 2013
Exterior framing continues, and Rough-ins start
The back deck is taking shape...
As well as the front porch with the ridiculous expensive timber...
And both HVAC and Plumbing are onsite today to start rough-ins...
Friday, September 6, 2013
Wednesday, September 4, 2013
Tuesday, September 3, 2013
Monday, September 2, 2013
More Roofing
Spent the morning pumping out another 100 gallons or so of water from all the rain last night, and then had to move all the lumber by hand to make room to get the dumpster pulled and emptied since it's full.